From the foundation to the finish, Xpert Construction & Design delivers exceptional craftsmanship across new construction, remodeling, outdoor living, and everything in between. Your vision, built right.

Get a free Estimate Explore Services
Years in Business
Projects Complete
Average Rating
NEW BUILD
KITCHEN
OUTDOOR & POOL
New Construction Home Additions ADU / Granny Flats Kitchen Remodeling Bathroom Renovation Flooring Doors & Windows Outdoor Living Pool Houses Interior Remodeling Waterproofing Medical & Surgical TI Apartment Renovation Hotel TI Restaurant Build-Out New Construction Home Additions ADU / Granny Flats Kitchen Remodeling Bathroom Renovation Flooring Doors & Windows Outdoor Living Pool Houses Interior Remodeling Waterproofing Medical & Surgical TI Apartment Renovation Hotel TI Restaurant Build-Out

Xpert Construction & Design —
Building Trust Since 2001.

Xpert Construction & Design has been building trust alongside structures since 2001. What started as a small but dedicated operation grew into a full-service general contractor — and in 2007, we earned our General Contractor license, formalizing the expertise and standards we’d been holding ourselves to from day one.

With over two decades of hands-on experience, we serve homeowners and developers throughout the Silicon Valley region. Our reputation for exceptional work and honest communication has been built one project at a time — on time and on budget.

2001

FOUNDED
Started Operations in Silicon Valley

2007

GC LICENSED
CA General Contractor License #B890193

24+

YEARS STRONG
Still family-owned, still hands-on

Licensed & Fully Insured

Every project is covered by comprehensive liability insurance and completed by fully licensed trade professionals. Your home is protected at every stage.

Transparent Pricing

Detailed written estimates with no hidden fees. We walk you through every line item so you know exactly where your investment is going.

On-Time Delivery

We set realistic timelines and stick to them. Regular progress updates keep you informed — no surprises, no excuses.

ADU · New Construction · Room Additions

From Site to Finished Home

Every Xpert Construction & Design project — whether an ADU, a full new construction, or a room addition — follows these seven phases from initial site assessment through certificate of occupancy.

7

Build phases

~6mo

Avg ADU timeline

400+

Sq ft typical ADU

These phases apply to
  • ADU / Granny Flats
  • New Construction
  • Room Additions

Whether you’re building a backyard ADU, adding a new wing to your home, or breaking ground on a full new construction — these seven phases are the roadmap every Xpert project follows. The process, precision, and documentation standards remain consistent across all project types.

New construction timeline factors
Square footage

Size of the home

A 1,200 sq ft home and a 4,000 sq ft home follow the same seven phases — but framing, MEP, and finishes each scale with the total footprint.

Terrain & topography

Flat lot vs. hillside

A hillside or sloped site requires additional grading, retaining walls, engineered foundations, and sometimes caissons or piers — adding weeks to early phases.

Site conditions

Access & soil type

Tight access, poor soil bearing, rock excavation, or high water tables all affect site prep and foundation timelines. Every lot is evaluated individually.

Design complexity

Custom finishes & layout

Custom cabinetry, specialty tile, vaulted ceilings, or complex roof geometry extend the finish phase. Standard layouts move faster.

NOTE – A hillside or sloped site requires additional grading, retaining walls, engineered foundations, and sometimes caissons or piers — adding weeks to early phases.

Construction process

Seven phases, every Project Type

Phase 01

Site assessment & permits

2-4 weeks

Survey & soils

Geotechnical report

Permit submittal

Drawings to city

Permit approval

Green-tagged plans

Utility locate

Underground markings

Phase 02

Site preparation & demolition

1-2 weeks

Clearing

Vegetation removed

Rough grade

Equipment grading

Erosion control

Silt fence installed

Staging area

Materials laydown

Phase 03

Foundation

2-3 weeks

Excavation

Trenches to depth

Rebar & forms

Steel placed & inspected

Concrete pour

Footing/slab placed

Waterproofing

Foundation walls sealed

Phase 04

Framing

2-4 weeks

Mudsill

Plates secured to slab

Wall framing

Walls erected

Roof structure

Rafters & ridge set

Sheathing

OSB nailed off

Phase 05

MEP rough-in

2-4 weeks

Plumbing rough

Supply & drain lines

Electrical rough

Panels & wire runs

HVAC ducts

Duct runs placed

Framing inspection

City sign-off

Phase 06

Insulation, drywall, finishes & exterior

4-8 weeks

Insulation

Batt & spray foam

Drywall hung

Boards hung & screwed

Taping & texture

Tape, mud & texture coat

Paint

Primer & finish coats

Hard finishes

Tile, floor, trim

Doors & windows

Exterior units installed

Siding

Stucco, Hardie or wood

Roofing

Shingles — any roof type

Gutters & downspouts

Drainage system installed

Phase 07

Site preparation & demolition

1-2 weeks

Clearing

Vegetation removed

Rough grade

Equipment grading

Erosion control

Silt fence installed

Staging area

Materials laydown